We are PT. Bintang Energi Pratama

We are one of the Indonesian company that possesses competencies in Hydraulic Workover Unit (HWU) Operation. We provide oil & gas services sector possessing strategic global alliances established, in compliance with global standards in work safety and environment.

The BEP 225K is stand alone snubbing units designed and custom built to perform live or dead well interventions.The 225k has become a more versatile unit in recent years due to greater rotary capabilities 6,000 ft/lbs and a 11″ thru bore often needed to handle larger tubing hangers and bottom hole assemblies, and to perform a variety of live intervention such as fishing job, running completions, milling out multiple plugs after fracing and complex live well applications.

Our Vision

To develop a competitive team with full commitment, to provide total service to hydraulic workover operations.
BEP is constantly striving to improve and up the standards of being the best. This takes a team effort between customer, personnel and management. The results are innovative, superior solutions to problems encountered in the market, with improvement to the equipment and a closer, stronger working bond between the customer and BEP. This all adds up to BEP being the best in the business.

To become a world-class and nation-pride company, in the area of oil and gas services with total solutions to create optimum added values for the stakeholders.

Our Mision

Providing a range of high-quality services (one-stop services) for customer satisfaction and loyalty, supported by professional human resources, equipment availability, technology mastery, continuous improvement and product innovation development.
Carrying out all business activities based on the principles of good engineering practices with world class standards while realizing operation excellence through standardized and consistent implementation of quality, health and safety environment (QHSE) to represent Company’s competitiveness.

Safety

Safety is a critical element of BEP’s operations. No job is undertaken unless it can be done safely. BEP has a solid, proven, multi-level safety program that includes written policies and procedures, safety supervision, and required training on the job and in the classroom. Full participation of all personnel is required in safety drills, meetings, rig inspections and reporting with follow-up by management. All equipment and processes are designed, constructed and operated with safety in mind. Since its inception, BEP and its affiliates have maintained an excellent safety record and are constantly improving upon their safety standards.

The Unit

The 225K Hydraulic Workover Unit (HWU) is whole owned and managed by PT. Bintang Energi Pratama. It is a 225 K lbs capacity modular offshore and onshore HWU with 12 ft jack and 5,000 psi BOP stack, capable of performing a range of conventional workover services. These include but not limited to pulling and running completion strings, well killing and reverse circulating, fishing, milling, cementing, stimulation, sand control, well abandonment etc. The provision of 3-1/2” drill strings also enable the HWU to perform pumping and washing inside production casing and its liner.
The modular HWU is designed for fast rigging up and down with minimal time required, and also with minimum or no impact on existing production facilities. The initial mob/demob operations for all associated HWU equipment can be carried out by using supply vessel to small offshore platform.
Other Unit Own by BEP is HWU 150 K. It is a 150 K lbs capacity modular offshore and onshore HWU with 12 ft jack and 3,000 psi BOP stack, capable of performing a range of conventional workover services.

The Crew

PT. BEP Crew relies on its professional team which comprises of qualified engineers and operators of various disciplines. Our work force knowledge, capabilities and experience has determined our success in providing imparial, independent and fully integrated services to our clients.

The Last 3 Years Contract

1. Contract IPM-1, HWU 225 K, November – December 2017
2. Contract IPM-2, HWU 225 K, July 2018-June 2019.
3. Contract IPM-3, HWU 150 K, November 2018-April 2019.
4. Contract IPM-4, HWU 150 K, Mei 2019.
5. Contract IPM-5 HWU 225 K, August 2019-June 2020.
6. Contract IPM-7 Special Well Service, December 2019 – 2020
7. Contract IPM-8 HWU 225 K, July 2020-August 2020.
8. Contract IPM-9 HWU 225 K, October 2020-September 2021 (in progress)

Not sure which solution fits your business needs?